Tuesday, March 18, 2014

Dolly for the Exhibit Display Final Concept Full Scale Prototype_Interface Group


Three long wooden pieces are placed together in an I shape to begin constructing them together. The wheels have already been screwed in place.
Wooden pieces of dolly put together for construction.
The three dolly pieces are laid out to dry on a plastic after having been painted white.
Painting phase for the dolly pieces.
Three long wooden pieces are placed together in an I shape to after being painted. The pieces are put back together in order to reassemble them.
Dolly pieces reassembled after being painted.
The dolly sits in front of the image with other cardboard model pieces standing in the background. The instructor stands at the center inspecting the pieces.
Cardboard model pieces with dolly while instructor inspects.
The cardboard model is completely assembled with the dolly attached underneath. It is standing within the Ed Roberts Building within the lounge area.
Cardboard model mockup with dolly attached within Ed Roberts building.

No comments:

Post a Comment